Calender machine boot steps:
1, open the hot oil system
2, check the roller drive to meet the operational requirements.
3, use the console, control panel or control cabinet to open the drive.
4, use the console, control panel or control cabinet to open the paper drive.
5, the transmission from the speed control, to ensure that the speed difference between the roller is correct.
6, check whether you can start drawing paper.
7, lead the paper after the lead, check the work of the scanner, and check whether the open paper control is open.
8, check whether the calendering machine can be closed.
9, press the "CLOSE" closed nip, NIP will occur after the following conditions:
A calender will load the minimum set line pressure.
B The drive is controlled by tension.
10. Press the "LOADING" button to select the calender to load. The calender load is controlled by the set value.
11, at the same time, the following checks:
A Scraper is closed and swung.
B Temperature is set correctly.
C load set correctly 1, open the hydraulic system, lubrication system
(1) Nip control: The nip can be realized by the on-site operation buttons "NIP OPEN", "NIP RELIEFE" and "NIP LOAD". When the nip is closed, press the "NIP RELIEFE" button. When the signal is no longer flashing, press the "NIP LOAD" button to load the nip.
(2) Scraper control The upper and lower scraper control is achieved through the on-site switch.